USS Trout (SS-566) - Construction and Commissioning

Construction and Commissioning

The contract to build Trout was awarded to the Electric Boat Division of the General Dynamics Corporation of Groton, Connecticut, on 14 May 1948 and her keel was laid down there on 1 December 1949. She was launched on 21 August 1951, sponsored by Mrs. Albert H. Clark, the widow of Lieutenant Commander Albert H. Clark, the last commanding officer of the previous U.S. Navy ship of the name, USS Trout (SS-202). Trout was commissioned on 27 June 1952, with Commander George W. Kittredge in command.

Read more about this topic:  USS Trout (SS-566)

Famous quotes containing the word construction:

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)