USS Rehoboth (AVP-50) - Construction, Commissioning, and Shakedown

Construction, Commissioning, and Shakedown

Rehoboth was laid down on 3 August 1942 at Houghton, Washington, by the Lake Washington Shipyard. She was launched on 8 November 1942, sponsored by Mrs. R. P. McConnell, and commissioned on 23 February 1944, with Commander Robert Crawford Warrack, Jr., in command.

Read more about this topic:  USS Rehoboth (AVP-50)