Construction
Ramage was constructed utilizing efficient modular shipbuilding techniques pioneered by Ingalls in the 1970s and enhanced in recent years through the development of Product-Oriented Shipbuilding Technology (POST).
These innovative techniques allow a large ship, such as Ramage, to be built in three separate hull and superstructure modules and later joined to form the complete ship. Heavy machinery, such as propulsion equipment, as well as piping, duct work, and electrical cabling were installed in hundreds of sub-assemblies, which were joined to form dozens of assemblies. These assemblies were then joined to form the three hull modules. The ship's superstructure, or "deck house", was lifted atop the mid-body module early in the assembly process.
Ramage's launching was as unique as her construction. The ship was moved over land via Ingalls' wheel-on-rail transfer system and onto the shipyard's launch and recovery drydock. The drydock was ballasted down, and DDG 61 floated free on 11 February 1994. She was then moved to her outfitting dock in preparation for the traditional christening ceremony and completion of outfitting and testing.
Read more about this topic: USS Ramage (DDG-61)
Famous quotes containing the word construction:
“There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”
—John Dewey (18591952)
“The construction of life is at present in the power of facts far more than convictions.”
—Walter Benjamin (18921940)
“Theres no art
To find the minds construction in the face.”
—William Shakespeare (15641616)