USS Pargo (SSN-650) - Construction and Commissioning

Construction and Commissioning

The contract to build Pargo was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 26 March 1963 and her keel was laid down there on 3 June 1964. She was launched on 17 September 1966, sponsored by Mrs. James L. Holloway, Jr., the wife of retired Admiral James L. Holloway, Jr. (1898–1984), and commissioned on 5 January 1968 with Commander Steven A. White in command.

Read more about this topic:  USS Pargo (SSN-650)

Famous quotes containing the word construction:

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)