USS New Orleans (LPD-18) - Construction and Commissioning

Construction and Commissioning

New Orleans is the second vessel in the LPD-17 class of high-tech amphibious assault ships, which ferry Marines and their equipment to and from war zones. The contract to build it was awarded on 18 December 1998 to Northrop Grumman Ship Systems of New Orleans, Louisiana, and it's keel was laid down on 14 October 2002. The ship was christened on 20 November 2004, sponsored by Carolyn Shelton, the wife of General Henry H. Shelton, former Chairman, Joint Chiefs of Staff. The warship was actually launched three weeks later, on 11 December. The ship completed it's Builder's Trials on 26 October 2006.

New Orleans was commissioned on 10 March 2007 in New Orleans, Louisiana, two years behind schedule and 90 percent over budget. After commissioning, it steamed to San Diego, California via the Panama Canal to join the US Pacific Fleet. The ship arrived at her new homeport of Naval Base San Diego on 3 May 2007 and was assigned to Amphibious Squadron Five.

Read more about this topic:  USS New Orleans (LPD-18)

Famous quotes containing the word construction:

    No construction stiff working overtime takes more stress and straining than we did just to stay high.
    Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)