Construction and Commissioning
The contract to build Nevada was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 7 January 1981 and her keel was laid down there on 8 August 1983. She was launched on 14 September 1985 sponsored by Mrs. Carol Laxalt, the wife of United States Senator Paul Laxalt of Nevada, and commissioned on 16 August 1986, with Captain F.W. Rohm in command of the Blue Crew and Captain William Stone in command of the Gold Crew.
Read more about this topic: USS Nevada (SSBN-733)
Famous quotes containing the word construction:
“There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”
—John Dewey (18591952)