USS Horace A. Bass (APD-124) - Construction and Commissioning

Construction and Commissioning

Originally projected as a Rudderow-class destroyer escort (DE-691), Horace A. Bass (APD-124) was selected for completion to a modified design as a high-speed transport (APD), designed for landing and supporting raiding parties while retaining a secondary, destroyer escort-like role of convoy escort. Laid down on 3 August 1944 at Quincy, Massachusetts, by the Bethlehem Steel Company, Fore River, she was launched on 12 September 1944, sponsored by Mrs. Horace A. Bass Jr., widow of Ensign Horace A. Bass Jr., and commissioned on 21 December 1944, Lieutenant Commander F. W. Kuhn in command.

Read more about this topic:  USS Horace A. Bass (APD-124)

Famous quotes containing the word construction:

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)