USS Badger (FF-1071) - Commissioning

Commissioning

Badger was laid down on 17 February 1968 at San Pedro, California, by Todd Shipyards, Inc.; launched on 7 December 1968; sponsored by Mrs. Oscar C. Badger; and commissioned at Long Beach, California, on 1 December 1970, Commander William L. Britton in command.

Badger completed fitting out at the Long Beach Naval Shipyard in January 1971 and then spent most of the spring engaged in tests and shakedown training. She completed final contract trials in May, during which Badger set the speed record for Knox class frigates, over 30 knots. The following month, entered the Long Beach Naval Shipyard for post-shakedown availability. During that availability, she received extensive modifications including the addition of a basic point defense missile system (BPDMS) and of an independent variable depth sonar system. Because of those changes, Badger underwent a post-shakedown availability that lasted until mid-November. From that time until mid-March 1972, the destroyer escort conducted a series of underway tests and training evolutions and underwent readiness inspections. On 16 March 1972, she weighed anchor and stood out of Long Beach on her way to the Far East. Along the way, Badger stopped at Pearl Harbor, Midway, and Guam before arriving in Subic Bay on 7 April.

Read more about this topic:  USS Badger (FF-1071)