Construction and Commissioning
The contract to build Archerfish was awarded on 25 June 1968 and her keel was laid down on 19 June 1969 at Groton, Connecticut, by the Electric Boat Division of the General Dynamics Corporation. She was launched on 16 January 1971, sponsored by Miss Mary Conover Warner, and commissioned at her home port, New London, Connecticut, on 17 December 1971 with Commander Ralph Gordon Bird in command.
Read more about this topic: USS Archerfish (SSN-678)
Famous quotes containing the word construction:
“No construction stiff working overtime takes more stress and straining than we did just to stay high.”
—Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)