Construction and Commissioning
The contract to build Archerfish was awarded on 25 June 1968 and her keel was laid down on 19 June 1969 at Groton, Connecticut, by the Electric Boat Division of the General Dynamics Corporation. She was launched on 16 January 1971, sponsored by Miss Mary Conover Warner, and commissioned at her home port, New London, Connecticut, on 17 December 1971 with Commander Ralph Gordon Bird in command.
Read more about this topic: USS Archerfish (SSN-678)
Famous quotes containing the word construction:
“There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”
—John Dewey (18591952)