USNS Wheeling (T-AGM-8) - Victory Ship Built in Oregon

Victory Ship Built in Oregon

The second ship to be so named by the Navy, Wheeling was laid down on 10 April 1945 as Seton Hall Victory by the Oregon Shipbuilding Corporation under a U.S. Maritime Commission contract (MCV hull 686); launched on 22 May 1945; sponsored by Mrs. Ross Mclntyre; and delivered to the Maritime Commission on 21 June 1945.

Read more about this topic:  USNS Wheeling (T-AGM-8)

Famous quotes containing the words victory, ship, built and/or oregon:

    In victory be not proud; in defeat be not depressed.
    Chinese proverb.

    Small pity for him!—He sailed away
    From a leaking ship in Chaleur Bay,—
    John Greenleaf Whittier (1807–1892)

    The philosopher believes that the value of his philosophy lies in its totality, in its structure: posterity discovers it in the stones with which he built and with which other structures are subsequently built that are frequently better—and so, in the fact that that structure can be demolished and yet still possess value as material.
    Friedrich Nietzsche (1844–1900)

    When Paul Bunyan’s loggers roofed an Oregon bunkhouse with shakes, fog was so thick that they shingled forty feet into space before discovering they had passed the last rafter.
    —State of Oregon, U.S. public relief program (1935-1943)