Future
Currently there is plans to widen US 52 between Wadesboro to NC 24/NC 27, in Albemarle, to four-lanes by around 2015 (STIP: R-2320).
In the more distant future, US 52 between NC 65, in Winston-Salem, to I-74, near Mount Airy, is planned to be reconstructed to interstate-grade standards (STIP: I-4404).
In Winston-Salem, a bridge replacement (built in 1964) is currently under construction that crosses over Liberty Street and the Norfolk Southern Railroad Switching Yard. The project includes widening of Liberty Street, ramp improvements along US 52, and install new traffic signals in area. It is estimated at $19 million and to be completed on November 1, 2012.
Upgrades of US 52 to interstate grade, between Interstate 85 and Interstate 40/US 311 are estimated to cost $8.725 million. Property acquisition will start in June, 2012, with construction scheduled for May, 2013. Once completed, US 52 will be in concurrency with Interstate 285.
Read more about this topic: U.S. Route 52 In North Carolina
Famous quotes containing the word future:
“He had been given to behold
The races future trial place,
A fresh start for the human race.”
—Robert Frost (18741963)
“We stand at once the wonder and admiration of the whole world, and we must enquire what it is that has given us so much prosperity, and we shall understand that to give up that one thing, would be to give up all future prosperity. This cause is that every man can make himself.”
—Abraham Lincoln (18091865)
“The circuited city of the future will not be the huge hunk of concentrated real estate created by the railway. It will take on a totally new meaning under conditions of very rapid movement. It will be an information megalopolis.”
—Marshall McLuhan (19111980)