Future
A study to convert U.S. 169 to a freeway between U.S. 10 in Elk River to 277th Avenue north of Zimmerman was completed in late 2009. A complete review of the project by Mn/DOT will occur in 2011. A complete construction schedule and timeline will then by released by Mn/DOT. Allocation of funds for the project is currently underway and the only thing holding back from starting the project. The project is expected to cost around $178 Million. In the meantime, the 14 miles between U.S. 10 in Elk River to 277th Avenue north of Zimmerman will be resurfaced during the 2012 construction season. The construction will begin in May 2012.
Read more about this topic: U.S. Route 169 In Minnesota
Famous quotes containing the word future:
“All radio is dead. Which means that these tape recordings Im making are for the sake of future history. If any.”
—Barré Lyndon (18961972)
“To pin your hopes upon the future is to consign those hopes to a hypothesis, which is to say, a nothingness. Here and now is what we must contend with.”
—Angela Carter (19401992)
“The planets survival has become so uncertain that any effort, any thought that presupposes an assured future amounts to a mad gamble.”
—Elias Canetti (b. 1905)