Future
A study to convert U.S. 169 to a freeway between U.S. 10 in Elk River to 277th Avenue north of Zimmerman was completed in late 2009. A complete review of the project by Mn/DOT will occur in 2011. A complete construction schedule and timeline will then by released by Mn/DOT. Allocation of funds for the project is currently underway and the only thing holding back from starting the project. The project is expected to cost around $178 Million. In the meantime, the 14 miles between U.S. 10 in Elk River to 277th Avenue north of Zimmerman will be resurfaced during the 2012 construction season. The construction will begin in May 2012.
Read more about this topic: U.S. Route 169 In Minnesota
Famous quotes containing the word future:
“I would sum up my fear about the future in one word: boring. And thats my one fear: that everything has happened; nothing exciting or new or interesting is ever going to happen again ... the future is just going to be a vast, conforming suburb of the soul.”
—J.G. (James Graham)
“The future is ever a misted landscape, no man foreknows it, but at
cyclical turns
There is a change felt in the rhythm of events:”
—Robinson Jeffers (18871962)
“He who asks fortune-tellers the future unwittingly forfeits an inner intimation of coming events that is a thousand times more exact than anything they may say. He is impelled by inertia, rather than curiosity, and nothing is more unlike the submissive apathy with which he hears his fate revealed than the alert dexterity with which the man of courage lays hands on the future.”
—Walter Benjamin (18921940)