Future
A study to convert U.S. 169 to a freeway between U.S. 10 in Elk River to 277th Avenue north of Zimmerman was completed in late 2009. A complete review of the project by Mn/DOT will occur in 2011. A complete construction schedule and timeline will then by released by Mn/DOT. Allocation of funds for the project is currently underway and the only thing holding back from starting the project. The project is expected to cost around $178 Million. In the meantime, the 14 miles between U.S. 10 in Elk River to 277th Avenue north of Zimmerman will be resurfaced during the 2012 construction season. The construction will begin in May 2012.
Read more about this topic: U.S. Route 169 In Minnesota
Famous quotes containing the word future:
“Our system of government, in spite of Vietnam, Cambodia, CIA, Watergate, is still the best system of government on earth. And the greatest resource of all are the 215 million Americans who still have within us the strength, the character, the intelligence, the experience, the patriotism, the idealism, the compassion, the sense of brotherhood on which we can rely in the future to restore the greatness to our country.”
—Jimmy Carter (James Earl Carter, Jr.)
“There are many of us who cannot but feel dismal about the future of various cultures. Often it is hard not to agree that we are becoming culinary nitwits, dependent upon fast foods and mass kitchens and megavitamins for our basically rotten nourishment.”
—M.F.K. Fisher (19081992)
“The ellipse is as aimless as that,
Stretching invisibly into the future so as to reappear
In our present. Its flexing is its account,
Return to the point of no return.”
—John Ashbery (b. 1927)