U.S. Route 169 in Minnesota - Future

Future

A study to convert U.S. 169 to a freeway between U.S. 10 in Elk River to 277th Avenue north of Zimmerman was completed in late 2009. A complete review of the project by Mn/DOT will occur in 2011. A complete construction schedule and timeline will then by released by Mn/DOT. Allocation of funds for the project is currently underway and the only thing holding back from starting the project. The project is expected to cost around $178 Million. In the meantime, the 14 miles between U.S. 10 in Elk River to 277th Avenue north of Zimmerman will be resurfaced during the 2012 construction season. The construction will begin in May 2012.

Read more about this topic:  U.S. Route 169 In Minnesota

Famous quotes containing the word future:

    “In any future great national trial, compared with the men of this, we shall have as weak, and as strong; as silly and as wise; as bad and good.”
    —Abraham Lincoln (1809–1865)

    “At sixty, I would like to give my future back its vistas of uncertainty.”
    —Mason Cooley (b. 1927)

    “The ellipse is as aimless as that,
    Stretching invisibly into the future so as to reappear
    In our present. Its flexing is its account,
    Return to the point of no return.”
    —John Ashbery (b. 1927)