Future
A study to convert U.S. 169 to a freeway between U.S. 10 in Elk River to 277th Avenue north of Zimmerman was completed in late 2009. A complete review of the project by Mn/DOT will occur in 2011. A complete construction schedule and timeline will then by released by Mn/DOT. Allocation of funds for the project is currently underway and the only thing holding back from starting the project. The project is expected to cost around $178 Million. In the meantime, the 14 miles between U.S. 10 in Elk River to 277th Avenue north of Zimmerman will be resurfaced during the 2012 construction season. The construction will begin in May 2012.
Read more about this topic: U.S. Route 169 In Minnesota
Famous quotes containing the word future:
“I was so grateful to be independent of the academic establishment. I thought, how awful it would be to have my future hinge on such people and such decisions.”
—Jane Jacobs (b. 1916)
“How difficult the task to quench the fire and the pride of private ambition, and to sacrifice ourselves and all our hopes and expectations to the public weal! How few have souls capable of so noble an undertaking! How often are the laurels worn by those who have had no share in earning them! But there is a future recompense of reward, to which the upright man looks, and which he will most assuredly obtain, provided he perseveres unto the end.”
—Abigail Adams (17441818)
“It is the future that creates his present.
All is an interminable chain of longing.”
—Robert Frost (18741963)