University of Toronto High Altitude Group - Launch Timeline

Launch Timeline

  • August 8, 2005 - Low Altitude Dry Test
    • Mark Ia Vehicle
    • F40 Aerotech Motor
      • Successful Launch and Recovery
  • August 8, 2005 - Low Altitude Partial Payload Test
    • Mark Ia Vehicle
    • G75 Aerotech Motor
    • ATV Video Downlink and Colour CMOS Imager
      • Partial Failure Due to Payload Retention System
      • Partial Failure Due to Loss of Bus Power
  • July 22, 2006 - Low Altitude Rev. A Payload Test
    • Mark Ib Vehicle
    • Single Grain Cesaroni PRO38 Motor
    • ATV Video Downlink and Colour CMOS Imager
    • GPS Ground Tracking System
    • Onboard CPU and Data Storage
    • Barometric Pressure Sensing Payload
    • 1200 bit/s Radio Telemetry Downlink
  • Fall 2006 - Low Altitude Rev B. Payload Test
    • Mark Ic Vehicle
    • ATV Video Downlink a Colour CMOS Imager
    • GPS Ground Tracking System
    • Pyro Driven Recovery
    • Higher Performance CPU
    • Full 6 DOF IMU
      • Dual-Twin Axis +/- 300 deg/sec Solid State Gyro's (one redundant axis)
      • Triple Axis +/- 6G Accelerometer
      • High +/- 40G Accelerometer
      • Real Time Attitude and Position Determination algorithms onboard

Read more about this topic:  University Of Toronto High Altitude Group

Famous quotes containing the word launch:

    Now launch the small ship, now as the body dies
    and life departs, launch out, the fragile soul
    in the fragile ship of courage, the ark of faith
    with its store of food and little cooking pans
    and change of clothes,
    —D.H. (David Herbert)