Structural engineering for the bridge was carried out by Johs Holt AS, and Skanska Teknik AB. Skanska AB also served as general contractor, with subcontractors Alpin Technik und Ingenieurservice GmbH (general), VSL International (cables), mageba (bearings), and PERI GmbH (Formwork and Scaffolding)

The cables are steel and the deck is composite steel-reinforced concrete, while the pylons are reinforced concrete. About 9,000 metric tonnes of structural steel and 35,000 cubic meters of concrete were used. The Skanska site (linked below) gives a project cost of SEK 723 M/ USD 85 M in 2000 currency values.

There is a problem with ice sticking to the cables in the winter, which can fall onto cars. The bridge has to be closed a few times per year for this reason. The alternative road is 12 km longer. Civil engineers have tested PETD (a way to use a burst of electricity to remove ice caked on walls or windows. For surfaces coated with a special film, the jolt gets rid of ice in less than a second, far less time than it takes to hack at it with an ice scraper.) and decided to cover the Uddevalla Bridge in a 12-mil-thick PETD foil to keep it from icing over.

Read more about this topic:  Uddevalla Bridge

Famous quotes containing the words construction and/or notes:

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)

    Of all the horrid, hideous notes of woe,
    Sadder than owl-songs or the midnight blast,
    Is that portentous phrase, “I told you so,”
    Uttered by friends, those prophets of the past.
    George Gordon Noel Byron (1788–1824)