First Tyne Vehicle Tunnel
The vehicle tunnel is 1 mile or 5,500 feet (1,700 m) long and has a diameter of 31 ft 3 in (9.5 m) with a roadbed 24 ft (7.3 m). It was opened by Queen Elizabeth II on 19 October 1967, but commenced operational use only in 1968, on completion of the northern link roads. It was designed to handle 25,000 vehicles per day. The original toll for cars was 2s 6d (12.5p).
Read more about this topic: Tyne Tunnel
Famous quotes containing the words vehicle and/or tunnel:
“In all Works of This, and of the Dramatic Kind, STORY, or AMUSEMENT, should be considered as little more than the Vehicle to the more necessary INSTRUCTION.”
—Samuel Richardson (16891761)
“The only way to find out anything about what kinds of lives people led in any given period is to tunnel into their records and to let them speak for themselves.”
—John Dos Passos (18961970)