The final distance was 1051.73 miles (1692.60 km), slightly less than the original survey. At no point along the route does the line cross a permanent fresh watercourse.

Bores and reservoirs were established at intervals, but the water was often brackish and unsuitable for steam locomotive use, let alone human consumption, so water supplies had to be carried on the train.

In the days of steam locomotion, about half the total load was water for the engine.