Texas State Highway 99 - Future Construction

Future Construction

The next section that will be constructed is Section E, most likely followed by either Section F-1, F-2, or G. All of these sections are located northwest and north of Houston. Section E will run from the northern terminus of Section D north to US 290. Section F-1 will start at the end of Section E and end at the intersection with State Highway 249. Section F-2 begins here and terminates at Interstate 45. Section G starts at the end of Section F-2 and travels to US 59.

Future sections of the Grand Parkway will most likely be built as tollways in conjunction with the Harris County Toll Road Authority to speed up the loop's completion. Western sections of the Grand Parkway have been mentioned as possible bypass routes for the Houston section of the proposed Interstate 69 extension to the United States–Mexico border.

Read more about this topic:  Texas State Highway 99

Famous quotes containing the words future and/or construction:

    The moment the doctrine of the immortality is separately taught, man is already fallen. In the flowing of love, in the adoration of humility, there is no question of continuance. No inspired man ever asks this question, or condescends to these evidences. For the soul is true to itself, and the man in whom it is shed abroad cannot wander from the present, which is infinite, to a future which would be finite.
    Ralph Waldo Emerson (1803–1882)

    No real “vital” character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the author’s personality, developing by internal necessity as much as by external addition.
    —T.S. (Thomas Stearns)