Operation
Operators launch the aerostat from a large circular launch pad containing a mooring fixed or mobile system. The mooring systems contain a large winch with 25,000 feet (7,600 m) of tether cable. Operational availability is generally limited only by the weather (60 percent standard) and routine maintenance downtime. The aerostats are stable in winds below 65 knots (120 km/h). Aerostat and equipment availability averages more than 98 percent system-wide.
For security and safety reasons, air space around Air Force aerostat sites is restricted for a radius of at least two to three statute miles and an altitude up to 15,000 feet (4,600 m).
Read more about this topic: Tethered Aerostat Radar System
Famous quotes containing the word operation:
“Waiting for the race to become official, he began to feel as if he had as much effect on the final outcome of the operation as a single piece of a jumbo jigsaw puzzle has to its predetermined final design. Only the addition of the missing fragments of the puzzle would reveal if the picture was as he guessed it would be.”
—Stanley Kubrick (b. 1928)
“It is critical vision alone which can mitigate the unimpeded operation of the automatic.”
—Marshall McLuhan (19111980)
“Human knowledge and human power meet in one; for where the cause is not known the effect cannot be produced. Nature to be commanded must be obeyed; and that which in contemplation is as the cause is in operation as the rule.”
—Francis Bacon (15601626)