The B+H BuntingCoady Integrated Design Process
Teresa Coady is also known for her involvement in the creation and development of the building method utilized by B+H BuntingCoady and referred to as the ‘integrated design process’ (IDP). The B+H BuntingCoady Integrated Design Process is composed of a series of steps that, according to Coady: “(work) anywhere, anytime on any kind of building”. The phases of this IDP process include: Orientation and Massing Site Design and Water, Envelope, Ventilation, Lighting and Power, Heating and Cooling, Materials, Life-cycle costing, Quality Assurance.
Read more about this topic: Teresa Coady
Famous quotes containing the words integrated, design and/or process:
“Science is intimately integrated with the whole social structure and cultural tradition. They mutually support one otheronly in certain types of society can science flourish, and conversely without a continuous and healthy development and application of science such a society cannot function properly.”
—Talcott Parsons (19021979)
“I always consider the settlement of America with reverence and wonder, as the opening of a grand scene and design in providence, for the illumination of the ignorant and the emancipation of the slavish part of mankind all over the earth.”
—John Adams (17351826)
“Im not suggesting that all men are beautiful, vulnerable boys, but we all started out that way. What happened to us? How did we become monsters of feminist nightmares? The answer, of course, is that we underwent a careful and deliberate process of gender training, sometimes brutal, always dehumanizing, cutting away large chunks of ourselves. Little girls went through something similarly crippling. If the gender training was successful, we each ended up being half a person.”
—Frank Pittman (20th century)