Presently the system consists of two lines, 22 stations on 26.4 kilometres of track. 20 stations are below ground and two are surface level. Of the subterranean stations 16 are deep level and 4 shallow. The former comprise 6 pylon stations, 5 column and 5 single vaults (built to the Leningrad Technology). The shallow stations consist of three pillar-trispans and one single vault (Kharkov Technology). Due to Tbilisi's uneven landscape, the metro, particularly the Gldani-Varketili line, in two cases goes above ground.
In 2005 it was estimated that a total of 105.6 million people used the Metro annually. Carrying them are a fleet of 186 metro cars from two depots. Although the platforms are accommodated for five-carriage trains currently four and three carriage trains are used on lines 1 and 2 respectively. The car models are identical to those of other ex-Soviet Metros. The cost per token is 40 tetris, and remains valid for the whole duration. Trains run from 6:00 a.m. till 12:00 a.m. with intervals ranging between 2.5 minutes in peak times to 12 minutes late at night. Trains run between 60 km/h - 90 km/h.
Read more about this topic: Tbilisi Metro
Famous quotes containing the word operation:
“An absolute can only be given in an intuition, while all the rest has to do with analysis. We call intuition here the sympathy by which one is transported into the interior of an object in order to coincide with what there is unique and consequently inexpressible in it. Analysis, on the contrary, is the operation which reduces the object to elements already known.”
—Henri Bergson (18591941)
“It is critical vision alone which can mitigate the unimpeded operation of the automatic.”
—Marshall McLuhan (19111980)