Taoyuan International Airport MRT - Overview

Overview

The planned route starts from Terminal II of Taoyuan International Airport and extends eastward, passing through Luzhu, Linkou, Guishan, Xinzhuang, Sanchong, and finally terminating in Taipei City. From the airport, it will also extend southward passing by THSR Taoyuan Station before terminating in Zhongli. The route will be 51.03 km (31.71 mi)-long with 7 underground stations, 15 elevated stations, and two maintenance depots (Chingpu and Lujhu). Elevated track makes up 40.11 km (24.92 mi) of the total route length. The total budget for the project is NT$93.6 billion. As of late September 2012, the project is 82.64% complete. Upon completion, the line is expected to serve over 143,000 passengers per day. The line will have a maximum operational speed of 100 km/h (62 mph).

Read more about this topic:  Taoyuan International Airport MRT