TAI Anka - Development

Development

The contract regarding the development of an indigenous Medium Altitude Long Endurance (MALE) Unmanned Aerial Vehicle (UAV) system for the reconnaissance requirements of the Turkish Armed Forces became effective on 24 December 2004. Within the framework of the program, a total of three prototypes and ground systems will be designed, developed, manufactured and tested by mid-2011 as part of the prototype development phase. Subsequently in 2012, the serial production phase of Anka-A would be launched and additional 10 systems (meaning 30 air vehicles) built for the Turkish Air Force.

  • On 30 December 2010, the first TAI Anka unmanned aerial vehicle completed its debut flight, with 14 minutes of cruising, at 15:45 local time. Defence Minister Vecdi Gönül confirmed the flight.
  • On 5 May 2011, TAI released the test flight video of Anka. Anka-A flew a test and calibration mission of 2h 30m.
  • Turkish Aerospace Industries announced on the 25th of October 2011 that the ANKA had successfully completed its subsequent flight and landing tests and that it will now be in the Turkish Air Force inventory in 2012 that is much earlier than expected. Footage released by TAI also shows the ANKA landing successfully putting all speculation abouts its crash landings to rest.
  • On November 22, 2011, the Anka held the follow-up test flight for 6 hours at 20,000 ft. The vehicle demonstrated its automatic take-off and landing system for the first time.
  • On January 5, 2012, Defence Industry Executive Committee authorized Undersecretariat for Defence Industries to commence talks with Turkish Aerospace Industries for the serial production of 10 Anka vehicles.
  • On September 27, 2012, an Anka prototype crashed during a flight test due to a technical problem.
  • On January 20, 2013, Anka completed acceptance tests by the Turkish Air Force. The final acceptance tests were conducted near Ankara, and involved an 18 hour long, 200 km ring flight. The tests also included a night landing in adverse weather conditions. The Anka has flown more than 140 hours and reached and altitude of 26,000 feet.

Read more about this topic:  TAI Anka

Famous quotes containing the word development:

    The Cairo conference ... is about a complicated web of education and employment, consumption and poverty, development and health care. It is also about whether governments will follow where women have so clearly led them, toward safe, simple and reliable choices in family planning. While Cairo crackles with conflict, in the homes of the world the orthodoxies have been duly heard, and roundly ignored.
    Anna Quindlen (b. 1952)

    Such condition of suspended judgment indeed, in its more genial development and under felicitous culture, is but the expectation, the receptivity, of the faithful scholar, determined not to foreclose what is still a question—the “philosophic temper,” in short, for which a survival of query will be still the salt of truth, even in the most absolutely ascertained knowledge.
    Walter Pater (1839–1894)

    ... work is only part of a man’s life; play, family, church, individual and group contacts, educational opportunities, the intelligent exercise of citizenship, all play a part in a well-rounded life. Workers are men and women with potentialities for mental and spiritual development as well as for physical health. We are paying the price today of having too long sidestepped all that this means to the mental, moral, and spiritual health of our nation.
    Mary Barnett Gilson (1877–?)