Construction and Extension

Between 1981 and 1984, the first 2.7 miles (4.3 km) of the 8-foot (2.4 m) wide trail were paved and 16 bridges were constructed at a cost of $300,000. Easements across the 27 different parcels of land the path crossed were donated to the town.

A 2.6-mile (4.2 km) extension to the path was constructed between 1986 to 1989 at a cost of $380,000. In addition to the fundraising techniques used for the first leg, $120,000 was solicited from the town's tax funds. Due to the popularity of the first leg, the funds were granted. This second leg crossed land owned by 4 people, mostly agricultural land and included the construction of 4 bridges. When finished, the Bike Path was 5.3 miles (8.5 km) long, and had been completed at a cost of $680,000.

Read more about this topic:  Stowe Recreation Path

Famous quotes containing the words construction and/or extension:

    When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.
    Edmund Burke (1729–1797)

    Slavery is founded in the selfishness of man’s nature—opposition to it, is [in?] his love of justice.... Repeal the Missouri compromise—repeal all compromises—repeal the declaration of independence—repeal all past history, you still can not repeal human nature. It still will be the abundance of man’s heart, that slavery extension is wrong; and out of the abundance of his heart, his mouth will continue to speak.
    Abraham Lincoln (1809–1865)