South Morang Railway Line - Infrastructure

Infrastructure

The line is double track to South Morang. The line is controlled by automatic block signalling (ABS) up to South Morang. There are intermediate terminating facilities at Bell, Keon Park, and Epping. Stabling facilities are provided at Epping, which is also the location of a repair centre.

Read more about this topic:  South Morang Railway Line