A 900 metre long section of the line has been relocated, with a new bridge constructed to carry the railway line over the Hunter Expressway. The new section was built to mainline 1XC standards, with 60 kilogram per metre rails and concrete sleepers. The ends of the new section were adapted back to the existing lightweight rails. The owners of the line were given back the existing rails and servicable hardwood sleepers from the bypassed section of line.