History
The earliest evaluation of hydro potential of this vast reservoir was in 1942 when H.G. Acres Company carried out a study for the Aluminum Company of Canada (Alcan). Due to the remoteness of the site then, it was considered too expensive to build and deemed not viable.
With the development of technologies for transmission of electricity over long distances the project design to build the power development including the main dam and control structure and the many dykes began in July 1967 by Acres Canadian Bechtel of Churchill Falls, a joint venture formed by Canadian Bechtel and Acres Engineering, as part of the construction of the Churchill Falls Generating Station.
Read more about this topic: Smallwood Reservoir
Famous quotes containing the word history:
“The history of all hitherto existing society is the history of class struggles.”
—Karl Marx (18181883)
“... all big changes in human history have been arrived at slowly and through many compromises.”
—Eleanor Roosevelt (18841962)
“The history of philosophy is to a great extent that of a certain clash of human temperaments.”
—William James (18421910)