The earliest evaluation of hydro potential of this vast reservoir was in 1942 when H.G. Acres Company carried out a study for the Aluminum Company of Canada (Alcan). Due to the remoteness of the site then, it was considered too expensive to build and deemed not viable.

With the development of technologies for transmission of electricity over long distances the project design to build the power development including the main dam and control structure and the many dykes began in July 1967 by Acres Canadian Bechtel of Churchill Falls, a joint venture formed by Canadian Bechtel and Acres Engineering, as part of the construction of the Churchill Falls Generating Station.

Read more about this topic:  Smallwood Reservoir

Famous quotes containing the word history:

    History is the present. That’s why every generation writes it anew. But what most people think of as history is its end product, myth.
    —E.L. (Edgar Lawrence)

    Like their personal lives, women’s history is fragmented, interrupted; a shadow history of human beings whose existence has been shaped by the efforts and the demands of others.
    Elizabeth Janeway (b. 1913)

    Hence poetry is something more philosophic and of graver import than history, since its statements are rather of the nature of universals, whereas those of history are singulars.
    Aristotle (384–322 B.C.)