Additional Duties
In addition to the requirements laid out in the regulations the client and principal contractor must, so far as is reasonably practicable, comply with a number of additional duties laid out in the schedule to the regulations.
These include:
- Ensuring cooperation between contractors during the construction phase.
- Induction, information and training for every worker, with respect to the site waste management plan.
- Ensuring that waste produced is reused, recycled or recovered
There are also a number of other requirements relating to joint responsibilities for both the client and principal contractor. Failure to comply with this schedule is also an offence.
Read more about this topic: Site Waste Management Plans Regulations 2008
Famous quotes containing the words additional and/or duties:
“The mere existence of an additional child or children in the family could signify Less. Less time alone with parents. Less attention for hurts and disappointments. Less approval for accomplishments. . . . No wonder children struggle so fiercely to be first or best. No wonder they mobilize all their energy to have more or most. Or better still, all.”
—Adele Faber (20th century)
“He is asleep. He knows no longer the fatigue of the work of deciding, the work to finish. He sleeps, he has no longer to strain, to force himself, to require of himself that which he cannot do. He no longer bears the cross of that interior life which proscribes rest, distraction, weaknesshe sleeps and thinks no longer, he has no more duties or chores, no, no, and I, old and tired, oh! I envy that he sleeps and will soon die.”
—Albert Camus (19131960)