Shell in Situ Conversion Process - Current Implementations

Current Implementations

In 2006, Shell received a Bureau of Land Management lease to pursue a large demonstration with a capacity of 1,500 barrels per day (240 m3/d); Shell has since dropped those plans and is planning a test based on ICP that would produce a total of minimum 1,500 barrels (240 m3), together with nahcolite, over a seven-year period.

In Israel, IEI, a subsidiary of IDT Corp. is planning a shale pilot based on ICP technology. The project would produce a total of 1,500 barrels. However, IEI has also announced that any subsequent projects would not use ICP technology, but would instead utilize horizontal wells and hot gas heating methods.

In Jordan, Shell subsidiary JOSCO plans to use ICP technology to achieve commercial production by the "late 2020s." In October, 2011, it was reported that JOSCO had drilled more than 100 test holes over the prior two years, apparently for the sake of testing shale samples.

Read more about this topic:  Shell In Situ Conversion Process

Famous quotes containing the word current:

    Our current obsession with creativity is the result of our continued striving for immortality in an era when most people no longer believe in an after-life.
    Arianna Stassinopoulos (b. 1950)