Shah Alam Expressway - History

History

The Konsortium Expressway Shah Alam Selangor Sdn Bhd (KESAS) is a join consortium between Selangor State Development Corporation (PKNS), Gamuda Berhad, Arab Malaysian Development Berhad (AMDB) and Permodalan Nasional Berhad (PNB). Construction began in 1994. Phase 1 (Seafield-Sri Petaling) was completed in 1996 and Phase 2 (Seafield-Pandamaran) was completed in 1998. During 1998 Commonwealth Games in Kuala Lumpur, the expressway became a main route to National Sports Complex in Bukit Jalil.

The expressway formerly featured its own electronic toll collection system, known as the Express TAG. From 1 July 2004, the Express TAG was replaced by the Touch 'n Go and Smart Tag systems.

Read more about this topic:  Shah Alam Expressway

Famous quotes containing the word history:

    It is my conviction that women are the natural orators of the race.
    Eliza Archard Connor, U.S. suffragist. As quoted in History of Woman Suffrage, vol. 4, ch. 9, by Susan B. Anthony and Ida Husted Harper (1902)

    The history of the world is the record of the weakness, frailty and death of public opinion.
    Samuel Butler (1835–1902)

    Yet poetry, though the last and finest result, is a natural fruit. As naturally as the oak bears an acorn, and the vine a gourd, man bears a poem, either spoken or done. It is the chief and most memorable success, for history is but a prose narrative of poetic deeds.
    Henry David Thoreau (1817–1862)