Shah Alam Expressway - History

History

The Konsortium Expressway Shah Alam Selangor Sdn Bhd (KESAS) is a join consortium between Selangor State Development Corporation (PKNS), Gamuda Berhad, Arab Malaysian Development Berhad (AMDB) and Permodalan Nasional Berhad (PNB). Construction began in 1994. Phase 1 (Seafield-Sri Petaling) was completed in 1996 and Phase 2 (Seafield-Pandamaran) was completed in 1998. During 1998 Commonwealth Games in Kuala Lumpur, the expressway became a main route to National Sports Complex in Bukit Jalil.

The expressway formerly featured its own electronic toll collection system, known as the Express TAG. From 1 July 2004, the Express TAG was replaced by the Touch 'n Go and Smart Tag systems.

Read more about this topic:  Shah Alam Expressway

Famous quotes containing the word history:

    “As History stands, it is a sort of Chinese Play, without end and without lesson.”
    —Henry Brooks Adams (1838–1918)

    “This is the greatest week in the history of the world since the Creation, because as a result of what happened in this week, the world is bigger, infinitely.”
    —Richard M. Nixon (1913–1995)

    “All history attests that man has subjected woman to his will, used her as a means to promote his selfish gratification, to minister to his sensual pleasures, to be instrumental in promoting his comfort; but never has he desired to elevate her to that rank she was created to fill. He has done all he could to debase and enslave her mind; and now he looks triumphantly on the ruin he has wrought, and say, the being he has thus deeply injured is his inferior.”
    —Sarah M. Grimke (1792–1873)