Seville Metro - Tram Lines

Tram Lines

  • MetroCentro (T1), surface tram through the centre of Seville: Street level.
    • Stops: Plaza Nueva, Archivo de Indias, San Fernando and Prado de San Sebastián.
    • Length: 2.7 kilometres
    • Number of trains: 7 (manufactured by CAF).
    • Start of the works: Mid 2005.
    • End of the works: Spring/Summer 2007 (Only Prado de San Sebastián–San Fernando–Archivo de Indias–Plaza Nueva stations)
  • Aljarafe tram. Street level.
    • Start of the works: 2005.
  • Dos Hermanas tram. Street level.
    • Start of the works: 2008.
  • Alcalá de Guadaira tram. Street level.
    • Start of the works: 2008.

Read more about this topic:  Seville Metro

Famous quotes containing the word lines:

    “Was seiz’d by the spirit that trails in the lines underfoot,
    The rim, the sediment that stands for all the water and all the land
    of the globe.

    Fascinated, my eyes reverting from the south, dropt, to follow those slender windrows,
    Chaff, straw, splinters of wood, weeds, and the sea-gluten,
    Scum, scales from shining rocks, leaves of salt-lettuce, left by the tide,”
    —Walt Whitman (1819–1892)