Basic Data
- Operators, distances:
- East Japan Railway Company (Services and tracks)
- Aoba-dōri — Ishinomaki: 50.2 km / 31.2 mi.
- Japan Freight Railway Company (Services and tracks)
- Rikuzen-Yamashita — Ishinomaki-Minato: 1.8 km / 1.1 mi.
- Japan Freight Railway Company (Services)
- Rikuzen-Yamashita — Ishinomaki: 1.4 km / 0.9 mi.
- East Japan Railway Company (Services and tracks)
- Stations:
- Passenger stations: 31
- Freight terminals: 1 (Ishinomaki-Minato)
- Tracks:
- Double-track: Aoba-dōri — Higashi-Shiogama
- Single-track: Higashi-Shiogama — Ishinomaki
- Electrification: Whole line (1500 V DC)
- Railway signalling:
- Aoba-dōri — Ishinomaki: ATS-Ps
- CTC center: Miyagino Operation Control Center
Read more about this topic: Senseki Line
Famous quotes containing the words basic and/or data:
“Man has lost the basic skill of the ape, the ability to scratch its back. Which gave it extraordinary independence, and the liberty to associate for reasons other than the need for mutual back-scratching.”
—Jean Baudrillard (b. 1929)
“To write it, it took three months; to conceive it three minutes; to collect the data in itall my life.”
—F. Scott Fitzgerald (18961940)