Semmering Base Tunnel
On April 25, 2012 ground was broken for the construction of the 27.3km Semmering base tunnel. This tunnel will bypass 41km of the Semmeringbahn. The tunnel is expected to open in 2024, with a total cost of €3.1b.
Read more about this topic: Semmering Railway
Famous quotes containing the words base and/or tunnel:
“Shall we now
Contaminate our fingers with base bribes,
And sell the mighty space of our large honors
For so much trash as may be grasped thus?
I had rather be a dog and bay the moon
Than such a Roman.”
—William Shakespeare (15641616)
“The drama critic on your paper said my chablis-tinted hair was like a soft halo over wide set, inviting eyes, and my mouth, my mouth was a lush tunnel through which golden notes came.”
—Samuel Fuller (b. 1911)