Schiehallion Oilfield - Field Development

Field Development

Schiehallion field was discovered in 1993 by the semi-submersible drilling vessel Ocean Alliance while drilling the third exploration well in block 204 (well 204-3). The field is located in blocks 204/20 and 204/25 of the United Kingdom Continental Shelf in a water depth of 350 to 450 metres (1,150 to 1,480 ft). Recoverable oil reserves of Schiehallion are estimated to be between 450 and 600 million barrels (72×10^6 and 95×10^6 m3).

During 1994 and 1995 an appraisal of Schiehallion and Loyal was carried out, culminating in a successful extended well test, which demonstrated well rates of up to 20,000 barrels per day (3,200 m3/d). The combined development of the Schiehallion and Loyal fields was sanctioned in April 1996 and the oil production started on 29 July 1998.

The design and construction of the Schiehallion FPSO vessel was contracted to the Atlantic Frontier Alliance, an ad-hoc contracting consortium consisting of Harland and Wolff, SBM Offshore, and Brown and Root. The vessel was designed as a simple barge form, with a 245-metre (804 ft) length similar to a Suezmax tanker. The contract was placed in June 1995. The vessel was constructed at the Harland and Wolff shipyard in Belfast, and handed over to operator BP on 31 December 1997. The vessel has a dead-weight of 154,000 tonnes (152,000 long tons; 170,000 short tons), a processing capacity of 200,000 barrels per day (32,000 m3/d), and a storage capacity of 900,000 barrels (140,000 m3).

Oil and gas are produced from subsea wells via manifolds and rigid flowlines to a location underneath the vessel. From this point, flexible risers carry the production stream to the Schiehallion FPSO vessel. There are 42 subsea wells in total in five clusters with peak production rates of around 190,000 barrels per day (30,000 m3/d).

Oil is exported primarily to the Sullom Voe Terminal by the dynamically positioned shuttle tanker Loch Rannoch delivered in August 1998, and operated by BP Shipping.

Produced natural gas is partly used to power the vessel. The rest of the gas is exported through the West of Shetland pipeline to the Sullom Voe Terminal. Some of the exported gas is used as fuel in the Fortum operated Sullom Voe power station. The remainder is enriched with liquefied petroleum gas and exported to the Magnus platform for enhanced oil recovery in Magnus field.

After more than a decade working in the harsh North Atlantic, the Schiehallion FPSO is in a poor condition, and requires significant maintenance and repairs, which can only be performed in the summer season because of the hostile weather in the region. The increased water production is affecting the composition of the production fluids, and the FPSO processing system is becoming very constrained by the high water volume. As a consequence, a new FPSO is being built to replace the current vessel in order to continue production from the field. The current vessel is scheduled to cease production in March 2013 and to be removed from station in September 2013. The new vessel (Quad 204) will then be anchored in position during the first or second quarter of 2014.

Read more about this topic:  Schiehallion Oilfield

Famous quotes containing the words field and/or development:

    The snow had begun in the gloaming,
    And busily all the night
    Had been heaping field and highway
    With a silence deep and white.
    James Russell Lowell (1819–1891)

    They [women] can use their abilities to support each other, even as they develop more effective and appropriate ways of dealing with power.... Women do not need to diminish other women ... [they] need the power to advance their own development, but they do not “need” the power to limit the development of others.
    Jean Baker Miller (20th century)