During its years of operation widespread use occurred of highly toxic chemical additives to power over 30,000 rocket engine tests and to clean the rocket test-stands afterwards, as well as considerable nuclear research and at least four nuclear accidents, which has resulted in the SSFL becoming a seriously contaminated site and offsite pollution source requiring a sophisticated multi-agency and corporate Cleanup Project. A long process has been and is still ongoing to determine the site contamination levels and locations, cleanup standards to meet, methods to use, timelines and costs, and completion requirements - all still being defined, debated, and litigated. The Santa Susana Field Lab Cleanup Project is a very complex challenge: technically, logistically, politically, legally, and emotionally.
Regarding cleanup, the site's current owner is Boeing, with NASA and DOE liable for several parcels within that. On August 2, 2005, Pratt & Whitney purchased Boeing's Rocketdyne division, but declined to acquire SSFL as part of the sale.
Read more about this topic: Santa Susana Field Laboratory
Famous quotes containing the word project:
“Although I mean it, and project the meaning
As hard as I can into its brushed-metal surface,
It cannot, in this deteriorating climate, pick up
Where I leave off.”
—John Ashbery (b. 1927)