After observing reliability of winter truck traffic over Maine State Route 16, the Lawrence Plywood Company petitioned the railroad to resume service from their Carrabasset mill to Farmington. Operations resumed on 17 April 1933, with sale of unused equipment as scrap to meet operating costs. Dismantling of the former P&R began during the summer of 1934, but service to Phillips was required to reach the railroad machine shops; so the receivers petitioned for abandonment when rail removal reached Phillips in April 1935. A scrap metal firm purchased the railroad at auction in May and service ended on 2 July 1935. Remaining rails were lifted for scrap metal in 1936.