Saab 21 - Operational History

Operational History

The first of three J 21 prototypes flew on 30 July 1943 flown by SAAB test pilot Claes Smith. During the takeoff, the wrong flap setting resulted in the prototype running into a fence at the end of the runway, damaging one of the landing gears. The subsequent test flight ended with a successful landing on the undamaged undercarriage units.

A total of 54 J 21A-1 fighters constructed at the main plant in Trollhättan were delivered from December 1945, followed by 124 and 119 examples respectively of the J 21A-2 with revised armament and the J 21A-3 fighter-bomber. Utilized mainly in the bomber role, the limitation of the design led to a proposed front-engine replacement, the J 23. An evaluation of the two designs led to the decision to retain the J 21 series but to consider the modification of the airframe to accommodate a jet engine. While production line J 21A series aircraft were first selected for conversion, the initial piston-engine version continued in production in five series "batches" that were completed in 1948–1949. In service use, the J 21A was phased out after 1954.

Read more about this topic:  Saab 21

Famous quotes containing the word history:

    All history becomes subjective; in other words there is properly no history, only biography.
    Ralph Waldo Emerson (1803–1882)