Construction
Construction was started at Seabrook, Kent, near Hythe in Kent on 30 October 1804. The canal was completed in April 1809 at a total cost of £234,000. It was constructed in two sections: the longest section starts at Hythe and ends at Iden Lock in East Sussex; the second, smaller section, runs from the foot of Winchelsea Hill to Cliff End. Both sections are linked by the Rivers Rother and River Brede. Gun positions along the canal were generally located every 500 yards (460 m). Any troops stationed or moving along the Military Road would have been protected by the earthen bank of the parapet, which was piled up during construction.
Read more about this topic: Royal Military Canal
Famous quotes containing the word construction:
“Theres no art
To find the minds construction in the face.”
—William Shakespeare (15641616)
“No real vital character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the authors personality, developing by internal necessity as much as by external addition.”
—T.S. (Thomas Stearns)
“When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.”
—Edmund Burke (17291797)