Risk Analysis and The Risk Workshop
Risk analysis should be performed as part of the risk management process for each project. The data of which would be based on risk discussion workshops to identify potential issues and risks ahead of time before these were to pose cost and/ or schedule negative impacts (see the article on Cost contingency for a discussion of the estimation of cost impacts).
The risk workshops should be chaired by a large group ideally between 6 to 10 individuals from the various departmental functions (e.g. project manager, construction manager, site superintendent, and representatives from operations, procurement, controls, etc.) so as to cover every risk element from different perspectives.
The outcome of the risk analysis would be the creation or review of the risk register to identify and quantify risk elements to the project and their potential impact.
Given that risk management is a continuous and iterative process, the risk workshop members would regroup on at regular intervals and project milestones to review the risk register mitigation plans, make changes to it as appropriate and following those changes re-run the risk model. By constantly monitoring risks these can be successfully mitigated resulting in a cost and schedule savings with a positive impact on the project.
Read more about this topic: Risk Analysis (engineering)
Famous quotes containing the words risk, analysis and/or workshop:
“Every day, in this mostly male world, you have to figure out, Do I get this by charming somebody? By being strong? Or by totally allowing my aggression out? Youve got to risk failure. The minute you want to keep poweryouve become subservient, somebody who does work you dont believe in.”
—Paula Weinstein (b. 1945)
“Cubism had been an analysis of the object and an attempt to put it before us in its totality; both as analysis and as synthesis, it was a criticism of appearance. Surrealism transmuted the object, and suddenly a canvas became an apparition: a new figuration, a real transfiguration.”
—Octavio Paz (b. 1914)
“Had I made capital on my prettiness, I should have closed the doors of public employment to women for many a year, by the very means which now makes them weak, underpaid competitors in the great workshop of the world.”
—Jane Grey Swisshelm (18151884)