Proven Reserves - Numbered Terms

Numbered Terms

The engineering term P90 refers to 90 percent engineering probability, is a commonly accepted specific definition by Society of Petroleum Engineers, it does not take into account anything except technical concerns. Therefore, it is different from the business term which does take into account current break-even profitability, and regulatory and contractual approval, but is considered a very rough equivalent. The definition is certainly not universal. Energy Watch Group uses a different definition, P95.

Read more about this topic:  Proven Reserves

Famous quotes containing the word terms:

    “It is not [the toddler’s] job yet to consider other people’s feelings, he has to come to terms with his own first. If he hits you and you hit him back to “show him what it feels like,” you will have given a lesson he is not ready to learn. He will wail as if hitting was a totally new idea to him. He makes no connections between what he did to you and what you then did to him; between your feelings and his own.”
    —Penelope Leach (20th century)