President George Bush Turnpike - Expansion Plans

Expansion Plans

The next PGBT segment, the East Branch extension, is planned to begin at the PGBT Lake Ray Hubbard Interchange at I-30, extending south-southeast to near Duck Creek Way, then southward near Mesquite Metro Airport, terminating at I-20 near Rory Galloway Day Camp. The project is well into the planning stages, and an Environmental Impact Statement was under preparation in early 2012.

In the longer term, the North Central Texas Council of Governments is studying a very broad outer loop around the entire Dallas-Fort Worth metroplex. Assuming it receives environmental clearance, funding, and political support, much of it would be completed in the 2020s or 2030s. The PGBT is not part of this outer loop, but the PGBT East Branch alignment was closely coordinated with the loop's master plan. The segment of the proposed outer loop through southern Dallas County would be known as Loop 9 and would likely be the first segment to be built. The eastern terminus of PGBT would link to Loop 9 near the I-20 interchange.

Read more about this topic:  President George Bush Turnpike

Famous quotes containing the words expansion and/or plans:

    The fundamental steps of expansion that will open a person, over time, to the full flowering of his or her individuality are the same for both genders. But men and women are rarely in the same place struggling with the same questions at the same age.
    Gail Sheehy (20th century)

    In preparing for battle I have always found that plans are useless, but planning is indispensable.
    Dwight D. Eisenhower (1890–1969)