Port of Singapore - Terminals

Terminals

Port Operator Type Berths Quay length Quay cranes Area (Ha) Capacity (kTEU)
Brani (BT) PSA Container 9 2,629 29 79
Cosco-PSA (CPT) Cosco/PSA Container 2 720 m 22.8 >1,000
Jurong JTC Multi-Purpose 23 4,547 152
Keppel (KT) PSA Container 14 3,220 37 96
Pasir Panjang (PPT) Phase 1 PSA Container 6 1,885 19 71
Pasir Panjang (PPT) Phase 2A PSA Container 4 1,700 19 63 >4,000
Pasir Panjang (PPT) Phase 2B PSA Container 4 (1 under construction) 1,246 16 56 2,800
Pasir Panjang (PPT) Phase 2C PSA Container 7 (under construction) 5,600
Pasir Panjang (PPT) Phase 2D PSA Container 5 (under construction)
Pasir Panjang (PPT) Phase 3 PSA Container
Pasir Panjang (PPT) Phase 4 PSA Container
Pasir Panjang Wharves PSA General
Sembawang PSA General
Tanjong Pagar (TPT) PSA Container 8 2,320 27 80

Read more about this topic:  Port Of Singapore