Major Intersections
County | Location | Mile | km | Destinations | Notes | |||
---|---|---|---|---|---|---|---|---|
Chester |
West Goshen Township | 0.0 | 0.0 | US 202 south | Interchange | |||
West Whiteland Township | 2.2 | 3.5 | Pottstown Pike | Interchange, former routing of PA 100 | ||||
2.8 | 4.5 | US 30 (Exton Bypass) – Downingtown, Lancaster, King of Prussia, Philadelphia | Interchange | |||||
3.4 | 5.5 | US 30 Bus. (Lincoln Highway) |
||||||
Uwchlan Township | 6.4 | 10.3 | PA 113 (Uwchlan Avenue) | |||||
7.3 | 11.7 | I-76 / Penna. Tpk. – Harrisburg, Philadelphia, New Jersey | Exit 312 (Downingtown Exit) (I-76/PA Turnpike). | |||||
8.4 | 13.5 | Graphite Mine Road | Southern terminus of Eagle Bypass. | |||||
9.3 | 15.0 | Graphite Mine Road | Northern terminus of Eagle Bypass. | |||||
West Vincent Township | 11.3 | 18.2 | PA 401 (Conestoga Road) | |||||
South Coventry Township | 16.1 | 25.9 | PA 23 (Ridge Road) – St. Peters, Phoenixville | |||||
North Coventry Township | 20.3 | 32.7 | PA 724 (Schuylkill Road) – Birdsboro, Kenilworth | Interchange | ||||
20.7 | 33.3 | US 422 – Reading, King of Prussia | Interchange | |||||
Montgomery |
Pottstown | West High Street | Northbound exit and southbound entrance | |||||
21.2 | 34.1 | PA 663 (West King Street) | Southern terminus of PA 663 | |||||
Upper Pottsgrove Township | Farmington Avenue | Interchange | ||||||
Douglass Township | 27.3 | 43.9 | PA 73 (East Philadelphia Avenue) – Boyertown, Gilbertsville | Interchange | ||||
Berks |
Colebrookdale Township | New Berlinville | Interchange | |||||
Hereford Township | 37.1 | 59.7 | PA 29 south (Gravel Pike) – East Greenville | Southern terminus of concurrency | ||||
Lehigh |
Upper Milford Township | 41.2 | 66.3 | PA 29 / PA 100 Truck north (Chestnut Street) – Emmaus, Allentown |
Northern terminus of concurrency | |||
Macungie | PA 100 Truck south (Chestnut Street) – Emmaus |
|||||||
Trexlertown | Weilers Road | Access to Hamilton Blvd. At-grade intersection. | ||||||
US 222 south (Hamilton Boulevard) – Kutztown, Reading | Southbound exit. Southern terminus of US 222 concurrency. | |||||||
Grim Road/Mosser Road | At-grade intersection. | |||||||
US 222 north (Frederick J. Jaindl, Jr. Memorial Highway) – Allentown | PA 100 Northbound exit. North end of US 222 concurrency. US 222 continues to Allentown. | |||||||
Upper Macungie Township | 50.4 | 81.1 | I-78 / US 22 – Harrisburg, Allentown | Exit 49 (I-78/US 22). | ||||
Heidelberg Township | 58.8 | 94.6 | PA 309 (Appalachian Thruway) – Tamaqua, Hazleton, Allentown | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Read more about this topic: Pennsylvania Route 100
Famous quotes containing the word major:
“All of the great leaders have had one characteristic in common: it was the willingness to confront unequivocally the major anxiety of their people in their time. This, and not much else, is the essence of leadership.”
—John Kenneth Galbraith (b. 1908)