Palm Jumeirah Monorail - History

History

Construction began on the 5.45-kilometre (3 mi) monorail line in March 2006, under the supervision of Marubeni Corporation, with the monorail track completed in July 2008 and vehicle testing beginning in November 2008. Originally planned to open by December 2008, the opening was delayed to April 30, 2009. In 2010, day-to-day operations were taken over by the Middle-East branch of Serco.

The project budget is US$400 million, with an additional US$190M set aside for a 2-kilometre (1 mi) future extension to the Dubai Metro. Another source speaks of a budget of US$1.1 billion. A journey on the monorail costs Dhs15 one-way, 25 return.

Read more about this topic:  Palm Jumeirah Monorail

Famous quotes containing the word history:

    In the history of the United States, there is no continuity at all. You can cut through it anywhere and nothing on this side of the cut has anything to do with anything on the other side.
    Henry Brooks Adams (1838–1918)

    The history of philosophy is to a great extent that of a certain clash of human temperaments.
    William James (1842–1910)

    The disadvantage of men not knowing the past is that they do not know the present. History is a hill or high point of vantage, from which alone men see the town in which they live or the age in which they are living.
    Gilbert Keith Chesterton (1874–1936)