Design and Construction
The site was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency; Schiesseck was approved for construction in June 1931, after several proposals had been rejected. The gros ouvrage is of the typical fort palmé ("palm-shaped") form for a large position. The fort palmé is a distributed fortification, with its entrances and underground support areas more than a kilometer to the rear, connected to the combat blocks by a long underground gallery. The "palm" is composed of the grouped combat blocks, linked by galleries to the main trunk.
Read more about this topic: Ouvrage Schiesseck
Famous quotes containing the words design and/or construction:
“Delay always breeds danger; and to protract a great design is often to ruin it.”
—Miguel De Cervantes (15471616)
“No construction stiff working overtime takes more stress and straining than we did just to stay high.”
—Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)