Design and Construction
The Molvange site was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency, in 1930. Work by the contractor, Quintin & Lesprit, began the same year, and the position became operational in 1935, at a cost of 106 million francs.
Molvange occupies the lip of a wooded height that runs roughly perpendicular to the fortified front, sloping steeply on the east side. Compared with Rochonvillers, its companion to the west, Molvange's entries are closer to the front. They were, however, linked to the rear via a 60 cm narrow-gauge railway, which continued through the ouvrage to the combat blocks.
Read more about this topic: Ouvrage Molvange
Famous quotes containing the words design and/or construction:
“Delay always breeds danger; and to protract a great design is often to ruin it.”
—Miguel De Cervantes (15471616)
“When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.”
—Edmund Burke (17291797)