Ouvrage Kobenbusch - Design and Construction

Design and Construction

The Kobenbusch position forms the point of the Cattenom salient, where the east-west defensive line turns to the south. The site was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency, in 1930. Work by the contractor Verdun-Fortifications began in 1931, and the position became operational in 1935, at a cost of 65 million francs. Kobenbusch was served by a 60cm-gauge narrow-gauge railway, which enters at the munitions entrance and runs all the way out through the galleries to the combat blocks. On the surface, the railway connects to supply points to the rear and to other ouvrages.

Read more about this topic:  Ouvrage Kobenbusch

Famous quotes containing the words design and/or construction:

    Humility is often only the putting on of a submissiveness by which men hope to bring other people to submit to them; it is a more calculated sort of pride, which debases itself with a design of being exalted; and though this vice transform itself into a thousand several shapes, yet the disguise is never more effectual nor more capable of deceiving the world than when concealed under a form of humility.
    François, Duc De La Rochefoucauld (1613–1680)

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)