Ouvrage Immerhof - Design and Construction

Design and Construction

The Immerhof farm site was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency, in 1930. Work by the contractor Duval of Nancy began in 1931, and the position became operational in 1935, at a cost of 31 million francs.

Immerhof was the only ouvrage to be built using entirely cut-and-cover techniques, with no tunnelling, due to poor soil conditions. A high water table meant that the drinking water well was only 28 metres (92 ft) deep; no deep drain could be constructed under the galleries due to the shallow water table. The position was constructed entirely in reinforced concrete, as opposed to unreinforced mass concrete, causing a significant cost increase. It was named after a nearby farm.

Read more about this topic:  Ouvrage Immerhof

Famous quotes containing the words design and/or construction:

    Humility is often only the putting on of a submissiveness by which men hope to bring other people to submit to them; it is a more calculated sort of pride, which debases itself with a design of being exalted; and though this vice transform itself into a thousand several shapes, yet the disguise is never more effectual nor more capable of deceiving the world than when concealed under a form of humility.
    François, Duc De La Rochefoucauld (1613–1680)

    No construction stiff working overtime takes more stress and straining than we did just to stay high.
    Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)