Ouvrage Coume Annexe Sud - Design and Construction

Design and Construction

The site was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency; Coume was approved for construction in May 1931. It was completed at a cost of 13 million francs. The petit ouvrage was to receive a separate entry block in a second phase, never carried out.

Read more about this topic:  Ouvrage Coume Annexe Sud

Famous quotes containing the words design and/or construction:

    If I knew for a certainty that a man was coming to my house with the conscious design of doing me good, I should run for my life ... for fear that I should get some of his good done to me,—some of its virus mingled with my blood.
    Henry David Thoreau (1817–1862)

    There’s no art
    To find the mind’s construction in the face.
    William Shakespeare (1564–1616)