Ouvrage Coume Annexe Sud - Design and Construction

Design and Construction

The site was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency; Coume was approved for construction in May 1931. It was completed at a cost of 13 million francs. The petit ouvrage was to receive a separate entry block in a second phase, never carried out.

Read more about this topic:  Ouvrage Coume Annexe Sud

Famous quotes containing the words design and/or construction:

    What but design of darkness to appall?—
    If design govern in a thing so small.
    Robert Frost (1874–1963)

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)