Ouvrage Bousse - Design and Construction

Design and Construction

Bousse was approved for construction by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency, in 1930 and became operational by 1935, at a cost of 23 million francs. The contractor was Gianotti of Nice. Bousse was sited to control the Thionville-Hargarten and Metz-Bouzonville railroad lines. A plannedblock to cover the railroad cutting just beyond Block 1 was never built. It would have functioned much like a casemate in a counterscarp had it been built, with the cutting standing in for a traditional outer ditch.

Read more about this topic:  Ouvrage Bousse

Famous quotes containing the words design and/or construction:

    Nowadays the host does not admit you to his hearth, but has got the mason to build one for yourself somewhere in his alley, and hospitality is the art of keeping you at the greatest distance. There is as much secrecy about the cooking as if he had a design to poison you.
    Henry David Thoreau (1817–1862)

    When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.
    Edmund Burke (1729–1797)