Design and Construction
Bois-Karre was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency, in 1930. Work by the contractor Degaine-Dubois began in 1931, and the position became operational in 1935, at a cost of 10 million francs.
Bois-Karre was planned as an anchor point for a fortified line of retreat from the Cattenom salient formed by Kobenbusch and Oberheid. A firing chamber is arranged to cover the reinforcing line (bretelle de Cattenom), which was to be anchored at its other end by Block 2 of Ouvrage Galgenberg. The reinforcing line was never built.
Read more about this topic: Ouvrage Bois-Karre
Famous quotes containing the words design and/or construction:
“Joe ... you remember I said you wouldnt be cheated?... Nobody is really. Eventually all things work out. Theres a design in everything.”
—Sidney Buchman (19021975)
“When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.”
—Edmund Burke (17291797)